Up periscope(s)


Here's the completed work (prior to being buried in two inches of 2B stone fill). The funny thing is that the "real" problem with the septic was a clog at the header pipe, the pipe which runs from the septic (the tank that collects, holds and breaks downs the solids) to the drain field (where all the liquids flow out). These photos don't show the work that Parker Wastewater Consulting, Inc. did to remedy that problem.